文章來源(yuan):中國(guo)中煤能源(yuan)集團(tuan)公司 發布時間(jian):2009-10-10
近日,中煤集團五建公司二處麥垛山項目部收到神華寧夏煤業集團發來的賀信,祝賀該項目部9月份在寧煤集團麥垛山煤礦副立井和風井基巖段施工中,月單進分別突破120米和130米,創亞洲最大斷面立井(Φ9.4米)施工新紀錄。
該項目(mu)部進入基巖段施工(gong)(gong)后,一(yi)手抓(zhua)安(an)全生(sheng)產,一(yi)手抓(zhua)正規循環(huan)(huan)作業,從安(an)全、技(ji)術(shu)、工(gong)(gong)序(xu)、材(cai)料供應(ying)、職工(gong)(gong)培訓(xun)等七個方面作了詳細安(an)排,掘進隊(dui)(dui)對每一(yi)道工(gong)(gong)序(xu)定(ding)(ding)人、定(ding)(ding)時(shi)間、定(ding)(ding)標(biao)準。項目(mu)部管理人員(yuan)(yuan)、工(gong)(gong)程技(ji)術(shu)人員(yuan)(yuan)及其(qi)他輔助工(gong)(gong)種均實行(xing)(xing)24小(xiao)時(shi)輪(lun)流工(gong)(gong)作制(zhi),負(fu)責施工(gong)(gong)作業隊(dui)(dui)采用“滾班(ban)”作業制(zhi),機電及其(qi)他輔助工(gong)(gong)種采用“三八”工(gong)(gong)作制(zhi)。為切(qie)實落實安(an)全責任,項目(mu)部與(yu)區(qu)隊(dui)(dui)、區(qu)隊(dui)(dui)與(yu)班(ban)組、班(ban)組與(yu)職工(gong)(gong)之間層層簽(qian)訂了290份責任狀(zhuang),緊抓(zhua)打眼、裝藥(yao)這一(yi)關鍵環(huan)(huan)節,確保萬無一(yi)失。每天對設備進行(xing)(xing)檢修和維(wei)護,確保設備始(shi)終處于良好(hao)的運行(xing)(xing)狀(zhuang)態。經過不懈(xie)努力,每個循環(huan)(huan)作業都控制(zhi)在20小(xiao)時(shi)以內(nei),最快的縮短(duan)到(dao)17小(xiao)時(shi)43分鐘,工(gong)(gong)程施工(gong)(gong)取得了好(hao)成(cheng)績。